5572
potholes filled
IN 2025 (Thru 5/25)
3016
trees pruned
IN 2025 (Thru 5/25)
464
curb ramps installed
IN 2025 (Thru 5/25)
200
blocks resurfaced
IN 2025 (Thru 5/25)
8295
tons of debris collected
IN 2025 (Thru 5/25)



