831
potholes filled
IN 2025 (Thru 1/11)
895
trees pruned
IN 2025 (Thru 1/11)
75
curb ramps installed
IN 2025 (Thru 1/11)
56
blocks resurfaced
IN 2025 (Thru 1/11)
700
tons of debris collected
IN 2025 (Thru 1/11)



