A Surface-Mounted Facility (SMF) Permit is required for construction or installation of a SMF in any Public Right-of-Ways that are under the jurisdiction of Public Work. A SMF means any Utility facility (physical element or structure) that is installed, attached or affixed in the Public Right-of-Ways on a site that is above the surface of the street (except a utility pole or associated appurtenances) and that requires the Permittee to excavate in order to install the facility in the Public Right-of-Ways. SMFs do not include bus shelters and associated kiosks.