612
potholes filled
IN 2026 (Thru 1/31)
404
trees pruned
IN 2026 (Thru 1/31)
40
curb ramps installed
IN 2026 (Thru 1/31)
40
blocks resurfaced
IN 2026 (Thru 1/31)
2064
tons of debris collected
IN 2026 (Thru 1/31)







