Various Locations Pavement Renovation No. 56 and Sewer Replacement

San Francisco Public Works and the San Francisco Public Utilities Commission have partnered to complete infrastructure improvements on several blocks throughout San Francisco as part of our Various Locations #56 project. Our partnership allows us to minimize impacts to the public by consolidating our work whenever possible. This project will include sewer main replacement/rehabilitation, curb ramp installation, street base repairs, grinding (removal of existing asphalt) and repaving.

Construction is anticipated to begin at the first location in December 2022 with completion expected at the last location in June 2024. San Francisco Public Works will manage the project during construction. The work hours may vary by location; however, the typical working hours are 7:30 AM to 5 PM, Monday through Friday. Weekend work is allowed but is not anticipated at this time.

Below is a list of the blocks included in this contract:

15th Street (Vermont Street to Carolina Street)

Mariposa Street (Rhode Island Street to Texas Street)

19th Street (Carolina Street to Connecticut Street)

Pennsylvania Avenue (20th Street to Cesar Chavez Street)

26th Street (Rhode Island Street to Wisconsin Street)

Utah Street (23rd Street to 24th Street)

McKinnon Street (Lane Street to End)

Palou Avenue (Griffith Street to End/Fence)

Revere Street (3rd Street to Keith Street)

Shafter Avenue (3rd Street to Lane Street)

Shafter Avenue (Keith Street to Hawes Street)

Thomas Avenue (Lane Street to Jennings Street)

Thomas Avenue (Ingalls Street to Griffith Street)

Yosemite Avenue (3rd Street to Ingalls Street)

Note: Not all blocks will include sewer main replacement work. The blocks scheduled to include sewer work are as follows:

15th Street and De Haro Street intersection

Mariposa Street (Rhode Island Street to De Haro Street)

Mariposa Street (Wisconsin Street to Connecticut Street)

19th Street (Wisconsin Street to Arkansas Street)

Pennsylvania Street (20th Street to 22nd Street)

Pennsylvania Street (25th Street to Cesar Chavez)

Pennsylvania Street and 23rd Street intersection

26th Street and DeHaro Street intersection

McKinnon Avenue (Lane Street to End)

Revere Avenue (3rd Street to Keith Street)

Shafter Avenue (3rd Street to Lane Street)

Shafter Avenue (Keith Street to Hawes Street)

Thomas Avenue (Lane Street to Jennings Street)

Thomas Avenue and Hawes Street intersection

Yosemite Avenue near Ingalls Street intersection

The first phase of work on a block will include sewer main replacement and/or rehabilitation (lining). Once the new sewer main has been installed, or the existing one is lined, our engineers will review video of the sewer laterals to determine which, if any, need to be replaced. The sewer laterals are the connection between the main and the curb/sidewalk. Note: Sewer laterals are only replaced on an as-needed basis depending on the condition of the existing line. Sewer service will not be interrupted during construction. Please continue to use your household and business plumbing as usual.

Once the sewer work is complete on a block, crews will begin preparations to repave a block. Preparations will include concrete street base replacement work. This task will require the contractor saw-cut, excavate the broken concrete, and pour fresh cement. Replacing any damaged/broken street base now will help prolong the durability of the new pavement. This may happen at several locations along the block. Preparations may also include the installation of ADA compliant curb ramps at 4-way intersections and T-intersections.

STATUS In Progress
Location
Throughout San Francisco
Start Date December 12, 2022
Completion Date January 30, 2024
Release Date
Monday, November 21, 2022
Budget
$10.5 Million
Project Team

San Francisco Public WorksSan Francisco Public Utilities CommissionKJ Woods Construction, Inc.(415) 759-0506 Office(415) 780-7101 After-hours

Contact
Alex Murillo
Phone
(628) 271-2244