4977 17th St

Site: 1

Reason(s) for Tree Removal: Tree roots will be cut to fix sidewalk and water meter. Tree will be destabilized. Location is not replantable. 

Posting Period: 02/02/26 - 03/04/26

17 Ora Way

Site: 1

Reason(s) for Tree Removal: Tree has grown beyond containment. not sustainable for long term growing into path of travel and destroying siding of house. Location is not replantable. Permit 805553

Posting Period: 02/02/26 - 03/04/26

461 Roosevelt Way

Site: 1

Reason(s) for Tree Removal: Roots have significantly impacted gasline to house. Cannot be sustainably root pruned without destabilizing tree. Location is not replantable.

Posting Period: 01/20/26 - 02/19/26

24th Street Pavement Renovation and Infrastructure Improvement Project

 

Project Description
San Francisco Public Works and the San Francisco Public Utilities Commission partnered to bring safety improvements and infrastructure upgrades to 24th Street in the Noe Valley neighborhood. Our partnership allowed us to consolidate our work and minimize any impacts from construction. The limits of work on 24th Street were from Homestead Street to Guerrero Street. All work on this project has been completed.