VL Contract 35 Traffic Signals

Various Locations (VL) Traffic Signal Improvement Project

 

Scheduling period shown: August 17–September 14, 2026

 

The Contract 35 Traffic Signal Upgrade work schedule, revised August 25, 2026, includes traffic signal foundations, conduit and pull-box installation, temporary restoration, and sewer work at several San Francisco intersections. Work is scheduled to progress in phases beginning in August 2026.

 

Current and Upcoming Locations

Various Locations Pavement Renovation No. 82 and Sewer Replacement

Project Description

 

San Francisco Public Works has contracted Ronan Construction, Inc. to deliver the Various Locations Pavement Renovation No. 82 and Sewer Replacement project.

 

This multi-location infrastructure project will improve roadway conditions, pedestrian accessibility, drainage and sewer infrastructure at several locations throughout San Francisco. Construction is anticipated to begin in November 2026 and continue for approximately 470 calendar days.

 

 

Project Locations

136 Randolph St

Site: 1

Reason(s) for Tree Removal: Tree leans into public right of way at a severe angle, blocking sidewalk access. Pruning will not alleviate blockage. Large wound along trunk has decay exacerbated by horizontal exposure to rain. Location is replantable. 

Posting Period: 08/24/26 - 09/23/26

19 Majestic Ave

Site: 1

Reason(s) for Tree Removal: Root pruning for necessary sidewalk repair is expected to destabilize tree. Tree is unsustainable in this location due to narrow sidewalk and expected mature size of tree. Tree structure is very poor with multiple major stems arising from a single point of unknown stability due to accumulated aerial roots and debris. Location is replantable.

Posting Period: 08/24/26 - 09/23/26

1931 15th Ave

Site: 1

Reason(s) for Tree Removal: Tree located in unsustainable planter. Trunk is breaking out of planter and impeding accessibility to driveway. Repairs to be done on retaining wall require root pruning that is expected to destabilize tree. Permit 807156. Location is not replantable. 

Posting Period: 08/24/26 - 09/23/26

529 Clayton St

Site: 1

Reason(s) for Tree Removal: Significant root pruning for necessary sidewalk repair is expected to cause severe decline of the tree's health. Codominant stems show poor union with decay in trunk. Tree is crowding and negatively impacting adjacent tree. Location is not replantable. 

Posting Period: 08/24/26 - 09/23/26

Public Works Hearing

Notice is hereby given that the Director of Public Works will hold a remote public hearing via teleconference to consider the item(s) listed below and that said public hearing will be held as follows:

DATE:                    September 2nd, 2026

Time:                     10:00am

880 Folsom Street tree

NOTICE OF TREE REMOVAL By San Francisco Municipal Transportation Agency (SFMTA)

LOCATION: 880 Folsom Street

# OF TREES: One (1) Chinese Elm (Ulmus parvifolia)

POSTING PERIOD (30 days) From: 8/5/2026 Through: 9/4/2026

SFMTA proposes to remove the tree at the above location.

1306 York St

Site: 1, 2

Reason(s) for Tree Removal: Trees are in significant decline despite efforts by property owner to revive. Significant dieback with 5% live crown. One site is replantable while the other is too close to the adjacent site and is not replantable.

Posting Period: 08/17/26 - 09/16/26

324 Moultrie St

Site: 1

Reason(s) for Tree Removal: Uplift across entire path of travel ahead of significant grade drop. City has attempted to shave down uplift, but the sidewalk is too degrade. Tree is not expected to survive necessary root pruning to repair sidewalk. Location is replantable.

Posting Period: 08/17/26 - 09/16/26