Various Locations Curb Ramps No. 18
San Francisco Public Works has hired A. Ruiz Construction, Inc. to build curb ramps at several locations throughout San Francisco. The intersections included in this contract are as follow:
San Francisco Public Works has hired A. Ruiz Construction, Inc. to build curb ramps at several locations throughout San Francisco. The intersections included in this contract are as follow:
The Union Street Pavement Renovation and Sewer Project seeks to address aging infrastructure along one of San Francisco’s historic dining and shopping districts. The project limits are Union Street between Lyon Street and Powell St (29 blocks).
This project will include sewer main replacement and/or rehabilitation on some blocks, curb ramp work, bus pad installation, street base repairs and repaving along the project limits. Construction is anticipated to start in early 2027 with completion expected in Winter/Spring 2029.
Site: 1
Reason(s) for Tree Removal: Increased risk of whole tree failure as evidenced by severe reverse taper at base of stem, likely steming from past trunk gridling and significant root pruning for past sidewalk repair. Multiple codominant stems and branches with included bark similar to past failures. Open wounds with evidence of decay. Location is replantable.
Posting Period: 07/06/26 - 08/05/26
Notice is hereby given that the Director of Public Works will hold a remote public hearing via teleconference to consider the item(s) listed below and that said public hearing will be held as follows:
DATE: August 26th, 2026
Time: 10:00am
Notice is hereby given that the Director of Public Works will hold a remote public hearing via teleconference to consider the item(s) listed below and that said public hearing will be held as follows:
DATE: July 22nd, 2026
Time: 10:00am
Site: 1
Reason(s) for Tree Removal: Roots are uplifting sidewalk and impeding access to adjacent fire exit to buliding. Significant sidewalk uplift is along primary path to adjacent school from bus stop. Required root pruning will severely impact health of tree. Significant decay in trunk cavity from previous branch failure has an increased risk of trunk failure given species failure profile. Location is replantable.
Posting Period: 06/29/26 - 07/14/26
Site: 2
Reason(s) for Tree Removal: Recent failure has destabilized remaining branches. Tree will be pruned to address immediate hazard, but will be too severe to retain tree. Location is replantable.
Posting Period: 06/29/26 - 07/29/26
Site: 1
Reason(s) for Tree Removal: Roots are uplifting sidewalk and impeding access to adjacent fire exit to buliding. Significant sidewalk uplift is along primary path to adjacent school from bus stop. Required root pruning will severely impact health of tree. Significant decay in trunk cavity from previous branch failure has an increased risk of trunk failure given species failure profile. Location is replantable.
Posting Period: 06/29/26 - 07/29/26
Site: 1
Reason(s) for Tree Removal: Required root pruning for upcoming sidewalk repair expected to destabilize tree. Recent vehicle collission removed over half of tree crown. Remaining crown is weak and has poor stucture. Location is replantable.