3474
potholes filled
IN 2025 (Thru 4/25)
2386
trees pruned
IN 2025 (Thru 4/25)
248
curb ramps installed
IN 2025 (Thru 4/25)
111
blocks resurfaced
IN 2025 (Thru 4/25)
4317
tons of debris collected
IN 2025 (Thru 4/25)



