Traffic Signal Modifications Contract #36

Overview: February 2026 Update

 

The City continues to move forward with traffic signal upgrades and accessibility improvements at key intersections. Over the next three weeks, crews will be focused on completing signal punch list items, coordinating with utility providers, and finalizing curb ramp installations.

 

These efforts aim to enhance pedestrian safety, improve traffic flow, and support accessibility for all street users.

 

Work Schedule: January 19 – February 22, 2026

 

Various Locations Pavement Renovation and Sewer Replacement No. 35

Project Description

San Francisco Public Works and the San Francisco Public Utilities Commission have partnered to complete infrastructure improvements on several neighborhood blocks.  Our partnership allows us to minimize impacts to the public by consolidating work whenever possible.
 

Geary at Park Presidio Improvements Project

Project Description

Public Works began improvements at the intersection of Geary Boulevard and Park Presidio Boulevard in August 2018.  This project aims to provide a safer and more inviting environment for Muni passengers, pedestrians, runners and vehicular traffic at the intersection of Geary Boulevard and Park Presidio Boulevard. Our goal was to construct improvements and features that reflect the needs of the community and reinforce neighborhood identity. 

Road Repaving & Street Safety Bond

The $248 million Road Repaving and Street Safety Bond was approved by voters in November 2011. With it, the City is repaving streets in neighborhoods throughout San Francisco; repairing deteriorating bridges, overpasses and stairways; and making traffic, pedestrian and bicycle and safety improvements.
 

Balboa Streetscape Improvements

The Balboa Streetscape Improvement Project spans from 34th to 39th Avenue in the city's Outer Richmond District. Balboa Street is a vital commercial corridor serving the surrounding residential neighborhood. The renovation aims to create a safer and more welcoming environment for pedestrians, motorists, cyclists, and transit riders through the installation of targeted traffic-calming features.
 

Great Highway Pavement Renovation and Streetscape Improvement Project

The Great Highway was repaved from Point Lobos to Sloat Boulevard. This was a six month project. Streetscape improvements were made to the stretch of road along the Golden Gate Park at Ocean Beach between Fulton and Lincoln. The improvements included new curb ramps, pedestrian crossing and bicycle safety upgrades, and the installation of a landscaped roadway median. Water main installation work is also being performed as a part of the project.
 

Murphy Millwright's Cottage

The Millwright's Cottage, on the western side of Golden Gate Park, is situated adjacent to the Murphy Windmill currently being restored. Built in 1903 as the residence for the caretaker of the windmill, the Cottage is historically significant. The structure is a two story structure, features a slate-covered pitched roof with side-facing gables and bearing walls of brick, enclosing 2560 square feet, currently used as offices for personnel working on the windmill restoration project.

Point Lobos Streetscape Improvement Project

The Point Lobos Streetscape Improvement project boundaries are on Point Lobos Avenue between 42nd Avenue and 48th Avenue, in the city’s Outer Richmond neighborhood. As currently funded, the project will involve construction of new landscaped medians on three blocks, "thumbnail" medians and lane striping for traffic control and safer pedestrian traffic on the remaining three blocks, and infill street tree planting within the entire project area. The goal of the project is to enhance the appearance and safety of this scenic roadway.