318 28th St
Site: 1
Reason(s) for Tree Removal: tree is dead and replaceable
Posting Period: 10/19/2026 to 11/22/2026
Site: 1
Reason(s) for Tree Removal: tree is dead and replaceable
Posting Period: 10/19/2026 to 11/22/2026
Site: 1
Reason(s) for Tree Removal: Dead tree. not actively failing
Posting Period: 10/19/2026 to 11/22/2026
Sites: 1,2,3
Reason(s) for Tree Removal: Decay present at base of root. Several leaning stems toward sidewalk and road. Multiple Fruiting bodies at base of trunk. Each of the trees are in decline.
Posting Period: 10/19/2026 to 11/22/2026
Site: 1
Reason(s) for Tree Removal: Root uplifting sidewalk will destabilize tree once cut. Tree can not be sufficiently pruned for sidewalk clearance for pedestrian need. Resident placed caution tape on low hanging limb due to impacts on pedestrians. Location is replantable.
Posting Period: 10/13/26 - 11/12/26
Site: 1
Reason(s) for Tree Removal: Dead tree. Location is replantable.
Posting Period: 09/28/26 - 10/28/26
Site: 1
Reason(s) for Tree Removal: Dead tree. Location is replantable.
Posting Period: 09/28/26 - 10/28/26
Project Description
San Francisco Public Works has contracted Ronan Construction, Inc. to deliver the Various Locations Pavement Renovation No. 82 and Sewer Replacement project.
This multi-location infrastructure project will improve roadway conditions, pedestrian accessibility, drainage and sewer infrastructure at several locations throughout San Francisco. Construction is anticipated to begin in November 2026 and continue for approximately 470 calendar days.
Project Locations
Project Update
Our contractor will begin working on 14th Ave. and 15th Ave. on Monday October 05, 2026. Work on this portion of 14th and 15th avenues will be completed by the end of October barring any rain delays or unforeseens.
San Francisco Public Works has contracted with Esquivel Grading and Paving, Inc. to improve sewer utilities and renovate the roadway at various locations in San Francisco as part of the Various Locations Pavement Renovation and Sewer Replacement Project No. 85 (VL85). We will be performing this work in the Western Addition, Marina, Cow Hollow Laurel Heights, Outer Richmond, Haight Ashbury and Pacific Heights neighborhoods.