Reason(s) for Tree Removal: Monterey pine tree infested with pitch canker has large limbs with moderate to high likelihood of failure and home in strike zone. Removal of limbs would result in a 50% canopy loss and accelerate the exiting pitch canker and bark beetle infestation and create a structure where tree has low live crown ratio and increase likelihood of whole tree failure. Location is replantable.

Posting Period: 03/30/26 - 04/29/26

Various Locations Curb Ramps #17

Project Description

San Francisco Public Works has hired Sage Consulting Engineers, Inc. to construct new curb ramps at intersections throughout San Francisco. This project will include demolishing existing curb ramps & curbs, constructing new ADA-compliant curb ramps and reconstructing adjacent areas of the sidewalk and curb lane. The scope of work will include saw-cutting the sidewalk and gutter, removing concrete, framing and pouring concrete and placing asphalt in the gutter area.

Various Locations Pavement Renovation Project #68

Project Description

San Francisco Public Works is scheduled to complete infrastructure improvements on several blocks throughout the city as part of our Various Locations Pavement Renovation #68 project. This project may include curb ramp installation, concrete street base repairs, grinding (removal of existing asphalt) and repaving.
 

Various Locations Pavement Renovation and Sewer Replacement No. 60

Project Description

San Francisco Public Works has contracted with Precision Engineering Inc. to install new sewer utilities and renovate the roadway at various locations in San Francisco as part of the Various Locations Pavement Renovation and Sewer Replacement Project No. 60 (VL60). We will be performing this work in the Pacific Heights, Anza Vista, Western Addition, Cathedral Hill, Telegraph Hill, Inner Sunset and Outer Sunset neighborhoods. 

 

As-Needed Curb Ramp Construction for Street Resurfacing Program No.7

San Francisco Public Works has hired Precision Engineering, Inc. to construct new curb ramps at intersections throughout San Francisco. This project will include demolishing existing curb ramps & curbs, constructing new, ADA-compliant curb ramps and reconstructing adjacent areas of the sidewalk and curb lane.Work will be taking place at the following intersections:

Junipero Serra Boulevard Pavement Renovation & Sewer Replacement Project

Project Description

San Francisco Public Works and the San Francisco Public Utilities Commission have partnered to complete infrastructure improvements on Junipero Serra Blvd. as part of the Junipero Serra Boulevard Pavement Renovation & Sewer Replacement Project. The project limits are Junipero Serra Boulevard between Sloat Blvd. and 19th Avenue. Our partnership allows us to minimize impacts to the public by consolidating our work whenever possible.
 

Various Locations Pavement Renovations and Sewer Replacement No. 48

Project Description

San Francisco Public Works and the San Francisco Public Utilities Commission have partnered to complete infrastructure improvements on several blocks in the Sunset, Forest Hill, and Twin Peaks neighborhoods. Our partnership allows us to minimize impacts to the public by consolidating our work whenever possible. This project will include sewer main replacement (some blocks), curb ramp installation, street base repairs, grinding (removal of existing asphalt) and repaving.