7850
      
            potholes filled
      
            IN 2025 (Thru 8/25)
      
  5994
      
            trees pruned
      
            IN 2025 (Thru 8/25)
      
  834
      
            curb ramps installed
      
            IN 2025 (Thru 8/25)
      
  401
      
            blocks resurfaced
      
            IN 2025 (Thru 8/25)
      
  15150
      
            tons of debris collected
      
            IN 2025 (Thru 8/25)
      
   
 
 
 
 
     
   
   
  






