4572
potholes filled
IN 2025 (Thru 5/25)
2759
trees pruned
IN 2025 (Thru 5/25)
271
curb ramps installed
IN 2025 (Thru 5/25)
175
blocks resurfaced
IN 2025 (Thru 5/25)
6296
tons of debris collected
IN 2025 (Thru 5/25)



