3863 17th St

Site: 1

Reason(s) for Tree Removal: Brittle limbs and cracks in stem due to significant progression of fungal disease (anthracnose). Multiple cracks present in trunk and branches similar in condition to limb/stems with past failures overhanging roadway. Location is replantable.

Posting Period: 8/31/26 - 9/30/26

920 Harrison St

Site: 1

Reason(s) for Tree Removal: Significant root pruning for necessary sidewalk repair is expected to destabilize tree. Location in replantable.

Posting Period: 8/31/26 - 9/30/26

412 Webster St

Site: 2

Reason(s) for Tree Removal: Tree in severe decline with 5% live crown. Fungal fruiting body found at base indicative of significant internal decay. Location is not replantable.

Posting Period: 8/31/26 - 9/30/26

1472 Haight St

Site: 1

Reason(s) for Tree Removal: Tree trunk is leaning into public right of way causing clearance issues along a busy, commercial corridor. Poor root growth/attachment. Tree has reduced vigor. Location is replantable.

Posting Period: 8/31/26 - 9/30/26

Public Works Hearing

Notice is hereby given that the Director of Public Works will hold a remote public hearing via teleconference to consider the item(s) listed below and that said public hearing will be held as follows:

DATE:                    September 30th, 2026

Time:                     10:00am

Public Works Hearing

Notice is hereby given that the Director of Public Works will hold a remote public hearing via teleconference to consider the item(s) listed below and that said public hearing will be held as follows:

DATE:                    September 23rd, 2026

Time:                     10:00am

VL Contract 35 Traffic Signals

Various Locations (VL) Traffic Signal Improvement Project

 

Scheduling period shown: August 17–September 14, 2026

 

The Contract 35 Traffic Signal Upgrade work schedule, revised August 25, 2026, includes traffic signal foundations, conduit and pull-box installation, temporary restoration, and sewer work at several San Francisco intersections. Work is scheduled to progress in phases beginning in August 2026.

 

Current and Upcoming Locations

Various Locations Pavement Renovation No. 82 and Sewer Replacement

Project Description

 

San Francisco Public Works has contracted Ronan Construction, Inc. to deliver the Various Locations Pavement Renovation No. 82 and Sewer Replacement project.

 

This multi-location infrastructure project will improve roadway conditions, pedestrian accessibility, drainage and sewer infrastructure at several locations throughout San Francisco. Construction is anticipated to begin in November 2026 and continue for approximately 470 calendar days.

 

 

Project Locations

136 Randolph St

Site: 1

Reason(s) for Tree Removal: Tree leans into public right of way at a severe angle, blocking sidewalk access. Pruning will not alleviate blockage. Large wound along trunk has decay exacerbated by horizontal exposure to rain. Location is replantable. 

Posting Period: 08/24/26 - 09/23/26