Upper Haight Transit Improvement and Pedestrian Realm Project

Project Information

The Haight Street of today is markedly different than the Haight Street of past generations but many aspects of the public realm remain relatively unchanged. The Upper Haight Transit Improvement and Pedestrian Realm project is based on a community-supported vision to revitalize the streets, sidewalks and public spaces in the historic Haight-Ashbury neighborhood. The future design of Haight Street will enable the greatest possible degree of flexibility by creating urban spaces that are able to evolve with the changing demands of the neighborhood.

San Francisco Launches New Voter-Backed Tree Maintenance Program

SAN FRANCISCO LAUNCHES NEW VOTER-BACKED TREE MAINTENANCE PROGRAM

The City Takes Over Care of All Street Trees and Will Fix Tree-Related Sidewalk Damage

San Francisco, CA – Mayor Edwin M. Lee and San Francisco Public Works today celebrated the rollout of Street Tree SF, voter-backed initiative that places the care of all the street trees under City care.

TRAFFIC ADVISORY: Repaving Work on Crossover Drive in Golden Gate Park

For immediate release: May 19, 2017

Contact: Dadisi Najib, 415-748-7562

 

TRAFFIC ADVISORY: REPAVING WORK ON CROSSOVER DRIVE IN GOLDEN GATE PARK

Motorists Should Expect Delays and Use Alternate Routes During Construction

 

San Francisco, CA – Public Works crews are scheduled to repave the deteriorating roadway along the stretch of Crossover Drive between Park Presidio Boulevard and the 25th Avenue/Fulton Street intersection. 

Urbano Drive Sewer and Pavement Renovation

Work Locations and Approximate Timeline:

  • De Soto St. between Urbano Dr. and Halloway Ave. (February - March 2017)
  • Victoria St. between Urbano Dr. and Halloway Ave. (February - March 2017)
  • Moncado Way between Junipero Serra Blvd. and Paloma Ave. (March - April 2017)
  • Head St. between Halloway Ave. and Ashton Ave. ( March - April 2017)
  • Pico Ave. between Ashton Ave. and Urbano Drive (March - April 2017)
  • Paloma Ave. between Junipero Serra Blvd. and Ocean Ave. (April - May 2017)
  • Borica St. between Urbano Dr. to Halloway Ave. (April - May 2017)
  • Corona St. between Urbano Dr. to Halloway Ave. (May - June 2017)
  • Mercedes Way between Paloma Ave. to Junipero Serra Blvd. (June - July 2017)
  • Moncada Way between Paloma Ave. to Urbano Dr. (July - August 2017)
  • Cedro Ave. between Mercedes Way and Urbano Dr. (July - August 2017)
  • Cerritos Ave. between Mercedes Way and Ocean Ave. (September - October 2017)
  • Entrado Ct. and Borica St. (September - October 2017)
  • Corona St. and Urbano Dr. (October - November 2017)
  • Urbano Dr. - complete (March - November 2017)
  • Alviso St. between Urbano Dr. and Halloway Ave. (November - December 2017)
  • Monticello St. between Estero Ave and Halloway Ave. (December 2017 - January 2018)
  • Estero Ave. between Alviso St. and Lunado Way (January - February 2018)