James Rolph Clubhouse & Playground Renovation

The project consisted of renovation work to an existing single story, wood framed and textured concrete block building. The work also included adding 440 square feet to the west side of building; construct an exterior ramp, improvement of the outdoor court/walk/playground and site furnishings at various locations throughout the existing three acres.

 

Building

Murphy Millwright's Cottage

The Millwright's Cottage, on the western side of Golden Gate Park, is situated adjacent to the Murphy Windmill currently being restored. Built in 1903 as the residence for the caretaker of the windmill, the Cottage is historically significant. The structure is a two story structure, features a slate-covered pitched roof with side-facing gables and bearing walls of brick, enclosing 2560 square feet, currently used as offices for personnel working on the windmill restoration project.

Highland Avenue Bridge

Traffic Railing Replacement Completed March 2016

June 11, 2015 - The Highland Avenue Bridge closed for 6 months of construction.  Traffic rail replacement work included, demolishing and replacing the traffic rails. The Highland Avenue Bridge spans over San Jose Avenue which provides connection to downtown and the 280 freeway.  The bridge closure was largely due to efforts to maintain safe access on San Jose Avenue fo

Mansell Streetscape Improvements Project

Mansell Street was conceived in the 1950s as part of a never-completed cross-town freeway. By design, Mansell Street primarily serves motorized vehicles. The width of the traffic lanes and three different speed limits posted encourage speeding. Pedestrians have to walk on the street or climb over a guard rail and walk along an informal path to access different park facilities or to commute between neighborhoods.

Marina Bay Trail Planning

The Marina Bay Trail Planning project is an outreach process designed to look at alternative design options for the Bay Trail along Marina Boulevard from Scott to Baker streets. The process includes collecting data about the number of people walking, biking and driving in this section and gathering input from the community about what improvements they would like to see in this area. 

The guiding principles:

Marina Green Bicycle Trail Project

The Marina Green Bicycle Trail Improvement Project will complete a vital pedestrian and bicycle link in the San Francisco Bay Trail between Fort Mason and Crissy Field. This segment serves thousands of residents, commuters and tourists on a daily basis. The project will improve the safety and quality of experience for all users of the path. Improvements include widening segments of the path, repaving the entire length, removing existing barriers, and accessibility upgrades. The project also complements the repaving of Marina Boulevard.