Jefferson Streetscape Improvements Project - Phase II
Jefferson Street is the "main street" of San Francisco's Fisherman's Wharf, a global destination for locals and tourists alike. Construction of the first phase, two blocks from Hyde Street to Jones Street, was completed in June 2013. Phase II of the Jefferson Streetscape Improvements Project completes the remaining three blocks of the streetscape design on Jefferson Street, from Jones Street east to Powell Street.
PRESS RELEASE - Chinatown Streetscape Improvements Add Safety and Beauty along Broadway and Spofford - 7/30/2018
PRESS ADVISORY - Celebrations Set for Monday to Mark Completion of Two Chinatown Streetscape Projects 7-27-2018
PRESS RELEASE - Summer Cleaning: Volunteers to Spruce Up District 5 Neighborhoods - 7/27/2018
Mission Branch Renovation Project
The San Francisco Public Library is currently renovating the Mission Branch Library. On behalf of the Library, Public Works initiated a feasibility study that provided a needs assessment and analyzed the cost and practicality of design options. The study recommended moving forward with renovation of the Mission Branch Library, given that this branch lacks space to hold quality programs and the building’s systems are at the end of their service life. The library, one of seven Carnegie branches, opened in 1915 and was designed by G.
6th Street Pedestrian Safety Project
Project Update January 2025
- Electrical work at 6th St. and Folsom St intersection is on hold through the end of January.
- Concrete work at 6th St. and Folsom is on hold through the end of January.
- Concrete work at 6th and Harrison on hold through the end of January.
- Tree planting work continues 6th Street corridor through the end of the month
Fire Station No. 16
Fire Station No. 5
The Fire Station No. 5 seismic replacement project was funded by the Earthquake Safety and Emergency Response (ESER) Bond Program, a voter-backed initiative to strenghten neighborhood fire stations and other first response facilities.