2060 Union St

Site: 1

Reason(s) for Tree Removal: Necessary root pruning for previous sidewalk repair has created unstable long-term structure. Location is replantable. 

Posting Period: 02/02/26 - 03/04/26

Various Locations Pavement Renovation No. 81 and Sewer Replacement

Project Description

San Francisco Public works has hired Esquivel Grading & Paving, Inc. to carry out pavement renovation and sewage replacement projects throughout the city. This project is part of Various Locations Pavement Renovation and Sewage Replacement Project No. 81. This work will include grinding (removing existing asphalt), concrete base reconstruction, and curb ramp reconstruction to bring them up to ADA compliance. Sewer replacement work is included under this contract. 

Various Locations Pavement Renovation and Sewer Replacement No. 67B

Project Description

San Francisco Public Works has hired Michael O'Shaughnessy Construction, Inc. to complete infrastructure improvements on several blocks throughout the city as part of our Various Locations Pavement Renovations & Sewer Replacement Project #67B. This work will consist of roadway re-pavement, concrete base reconstruction, curb ramp construction, making them ADA compliant and sewer replacement work.

Various Locations Curb Ramps #17

Project Description

San Francisco Public Works has hired Sage Consulting Engineers, Inc. to construct new curb ramps at intersections throughout San Francisco. This project will include demolishing existing curb ramps & curbs, constructing new ADA-compliant curb ramps and reconstructing adjacent areas of the sidewalk and curb lane. The scope of work will include saw-cutting the sidewalk and gutter, removing concrete, framing and pouring concrete and placing asphalt in the gutter area.

Traffic Signal Modifications Contract #36

San Francisco Public Works has partnered with Bay Area Light Works, Inc. to upgrade traffic signal infrastructure at 14 intersections across San Francisco. The scope of work will include excavation at some of the intersections, new traffic pole installation and electrical conduit work. Some intersections will also include curb ramp installation.

Various Locations Pavement Renovation and Sewer Replacement No. 60

Project Description

San Francisco Public Works has contracted with Precision Engineering Inc. to install new sewer utilities and renovate the roadway at various locations in San Francisco as part of the Various Locations Pavement Renovation and Sewer Replacement Project No. 60 (VL60). We will be performing this work in the Pacific Heights, Anza Vista, Western Addition, Cathedral Hill, Telegraph Hill, Inner Sunset and Outer Sunset neighborhoods.