3555 Washington St

Site: 1

Reason(s) for Tree Removal: Tree is in severe decline, likely due to heart rot common in this species. Severely thin and chlorotic crown. Location IS replantable and tree will be replaced by property owner.

Posting Period: 03/24/25 - 04/23/25

824 Baker St

Site: 1

Reason(s) for Tree Removal: The tree asset has developed multiple stems and exhibits a weak, unbalanced growth pattern, resulting in poor structural integrity. Its roots have extended from the sidewalk into the adjacent property, infiltrating the nearby garage and causing damage to the concrete. The tree's growth is unsustainable and poses a risk to the surrounding structures. Location IS replantable.
 

Posting Period: 03/10/25 - 04/09/25

3363 Washington St

Site: 2

Reason(s) for Tree Removal: Tree in significant decline with lean over sidewalk. Location is replantable and will be planted by applicant. Permit 79872
 

Posting Period: 03/10/25 - 04/09/25

8th St, Clay St, and Leavenworth St. Pavement Renovation and Sewer Replacement Contract #2308i

Project Description
 
SF Public Works and our contractor Ronan Construction will be making major infrastructure improvements to the Nob hill, Tenderloin/Theatre District and SoMa communities.  These improvements consist of  sewer main replacement, localized road base repair, curb ramp construction, bus pad installation amd pavement renovation curb to curb.  We are still in the pre-construction phase and anticipate work to start sometime this spring.  This webpage will be updated bi-weekly so please revisit us for construction

Various Locations Pavement Renovation and Sewer Replacement No. 67B

Project Description

San Francisco Public Works has hired Michael O'Shaughnessy Construction, Inc. to complete infrastructure improvements on several blocks throughout the city as part of our Various Locations Pavement Renovations & Sewer Replacement Project #67B. This work will consist of roadway re-pavement, concrete base reconstruction, curb ramp construction, making them ADA compliant and sewer replacement work.

Various Locations Curb Ramps #17

Project Description

San Francisco Public Works has hired Sage Consulting Engineers, Inc. to construct new curb ramps at intersections throughout San Francisco. This project will include demolishing existing curb ramps & curbs, constructing new ADA-compliant curb ramps and reconstructing adjacent areas of the sidewalk and curb lane. The scope of work will include saw-cutting the sidewalk and gutter, removing concrete, framing and pouring concrete and placing asphalt in the gutter area.

Traffic Signal Modifications Contract #36

San Francisco Public Works has partnered with Bay Area Light Works, Inc. to upgrade traffic signal infrastructure at 14 intersections across San Francisco. The scope of work will include excavation at some of the intersections, new traffic pole installation and electrical conduit work. Some intersections will also include curb ramp installation.